Thursday, July 27, 2017
Insurance coughs up cost of repairing Blaydon footbridge
Last week at full council in Gateshead, Lib Dem Cllr, Jonathan Wallace, raised the issue of who paid for the repairs to the Blaydon Footbridge. Last August, a lorry driver drove into the bridge causing considerable damage. A section of the bridge had to be removed. The repairs and replacement of the missing section took place earlier this month. Cllr Wallace had previously raised concerns that the costs would fall on local council taxpayers.
"I'm pleased to report that the driver's insurance has paid for the repairs. Well done to the officers of the council who ensured the insurance of the responsible driver paid for the work," said Jonathan.
The start of the video above was shot in December 2016 when the central section was still missing with the 2nd half of the video being shot earlier this month when the missing section was installed.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment